MV EQUIPMENT

RENTAL SOLUTION

Substation, transformer, cables, etc.

Solutions adapted to your needs IN MV EQUIPMENT UP TO 33KV-5MVA

From the emergency rental of a MV/LV transformer in the context of a failure of the equipment in place to the implementation of complete cabins, in C13-100 or C13-200, Drekan Power Rental is able to accompany you on your temporary need for MV equipment. In addition to transformers or cabins, we have a wide variety of accessories intended to facilitate their implementation and increase the safety of the installations.

•  ONAN transformers from 100 to 5000KVA for primary voltages from 3.2 to 33KV.
•  Dry transformers available on request,
•  C13-200 cabin for use on private HTA network for powers up to 3150KVA
•  C13-100 cubicle with low voltage metering for use on public network with transformer up to 1250KVA HN64-S33 standard / Certification and ETA in progress on the ST64-S30
•  C13-100 TIPI type cabin for public distribution
•  C13-100 cabinet with high voltage metering for use on public network
•  Compact tunnel substations with dry transformers and integrated LV distribution.
•  Flexible or rigid cable with or without sockets up to 24KV
•  Lifting stations for generators up to 6MVA

Many tailor-made solutions are also possible, do not hesitate to contact us.

MV/LV transformer substation for use on a private network compliant with C13-200 >>
MV/LV transformer substation for use on public networks compliant with C13-100 >>
Rental of compact cabins for use in tunnels >>
Rental of Transformers only from 250 to 5000KVA and from 3.2 to 33KV >

An optimized range of equipment

COMMON USE 20KV/400V TRANSFORMERS (see our catalog for other voltages/powers)

OUR 20KV/400V “DISTRIBUTION” MV/LV TRANSFORMERS
Références
Up (V)
Us (V)
P(KVA)
Couplage
Cooling
Disp
Pdf
TD-20000/400-250KVA
20000
400
250
DYN11
Huile
TD-20000/400-400KVA
20000
400
400
DYN11
Huile
TD-20000/400-630KVA
20000
400
630
DYN11
Huile
TD-20000/400-800KVA
20000
400
800
DYN11
Huile
TD-20000/400-1000KVA
20000
400
1000
DYN11
Huile
TD-20000/400-1250KVA
20000
400
1250
DYN11
Huile
TD-20000/400-1600KVA
20000
400
1600
DYN11
Huile
TD-20000/400-2000KVA
20000
400
2000
DYN11
Huile
TD-20000/400-2500KVA
20000
400
2500
DYN11
Huile
TD-20000/400-3150KVA
20000
400
3150
DYN11
Huile
TD-20000/400-5000KVA
20000
400
5000
DYN11
Huile

OUR 20KV/400V “DISTRIBUTION” MV/LV TRANSFORMERS

OUR 20KV/400V “DISTRIBUTION” MV/LV TRANSFORMERS
Références
Up (V)
Us (V)
P(KVA)
Couplage
Cooling
Disp
Pdf
TD-20000/400-250KVA
20000
400
250
DYN11
Huile
TD-20000/400-400KVA
20000
400
400
DYN11
Huile
TD-20000/400-630KVA
20000
400
630
DYN11
Huile
TD-20000/400-800KVA
20000
400
800
DYN11
Huile
TD-20000/400-1000KVA
20000
400
1000
DYN11
Huile
TD-20000/400-1250KVA
20000
400
1250
DYN11
Huile
TD-20000/400-1600KVA
20000
400
1600
DYN11
Huile
TD-20000/400-2000KVA
20000
400
2000
DYN11
Huile
TD-20000/400-2500KVA
20000
400
2500
DYN11
Huile
TD-20000/400-3150KVA
20000
400
3150
DYN11
Huile

C13-100 MV/LV SUBSTATIONS IN CURRENT USE (SEE OUR CATALOG FOR OTHER CABIN CONFIGURATION)

NOS TRANSFORMATEURS HTA/BT «DE DISTRIBUTION» 20KV/400V
Références
Up (V)
Us (V)
P(KVA)
Couplage
Cooling
Disp
Pdf
TD-20000/400-250KVA
20000
400
250
DYN11
Huile
TD-20000/400-400KVA
20000
400
400
DYN11
Huile
TD-20000/400-630KVA
20000
400
630
DYN11
Huile
TD-20000/400-800KVA
20000
400
800
DYN11
Huile
TD-20000/400-1000KVA
20000
400
1000
DYN11
Huile
TD-20000/400-1250KVA
20000
400
1250
DYN11
Huile

REMINDER ON THEORETICAL AVAILABILITY OF TRANSFORMERS

DREKAN-POWER-RENTAL has a large fleet of generators, however, the number of machines available in some references is limited to a few copies that can also be already rented. We cannot therefore guarantee immediate availability for some equipment. We therefore propose in the last column of the reference tables an availability indicator which will allow you possibly to anticipate your requests.
Generating set generally available without delay requiring only a few hours of preparation and transport time a few days away.
Generating set available in limited stock, depending on current rentals or replenishment times with our partners, 2 to 5 days may be required to deliver operational equipment.
Specific generator set managed in the fleet only 1 or 2 units, may require 4 to 6 weeks to be returned available and prepared.